To make it easier to attach baseboard moldings, add wooden blocking between the studs at the bottom before you begin putting up wallboard. Using a level, adjust the stud at the top so it is perfectly plumb. Cut the floor track to the proper length by first cutting both flanges with the snips. Fixed clips are commonly used and give designers a greater number of options in bypass framing. Since this is a simple hypothetical project, we'll keep the tools required to a minimum, some of them you likely already own. Install the drywall using 1 1/4-inch fine-thread, self-tapping drywall screws. Steel stud framing for non-load bearing interior partitions is secured to floors and ceilings with runners fastened to the supporting structure. The Steeler Technical Design Catalog is a collection of typical designs for steel framing and connections to help guide with your design process. Metal studs interlock, requiring less storage space. For the sample project described below, let's say you are planning to build a simple non-load-bearing basement wall that runs perpendicular to the overhead joists. While steel does not burn, it will fail suddenly and catastrophically when it approaches the melting point. Metal studs are usually mechanically fastened with screws. Steel framing is easier to handle because steel studs weigh 1/ less than wood studs, and can be installed at 4” on center. At first, you’ll find framing with steel studs to be slower than with wood studs, because you’ll be working with unfamiliar materials, techniques and tools. Metal studs are generally considered suitable for framing non-load-bearing walls and in particular for finishing basement spaces where the potential for excess moisture presents the problem of rot and mold growth with wood construction. Stiffener plates are commonly installed around openings to strengthen connections. SFA Framing Guide (pdf) Download. The easiest way to do this is by using a stud adjusted for plumb to position the upper track. How to Install Metal Studs: 13 Steps (with Pictures) - wikiHow The studs have a small lip on either end of the open side that lends them additional structural strength. Drywall installation for metal studs is really no different than for wood framing, although it can take some practice to make sure the screws bite properly into the steel. Accomplish this by placing the ends of the steel stud into the track at a slight angle and then twisting it into position. Structural metal stud framing refers to the construction of walls and planes using cold-formed steel components. A former agency art director then freelance designer, illustrator and copywriter, Bill has written for the medical, technical, industrial, food and agricultural industries. All framing lumber should be the correct grade for the intended use, and 38 mm x … LIGHTWEIGHT STEEL FRAMING ARCHITECTURAL DESIGN GUIDE PREFACE This publication is intended as a guide for designers, speci˜ers and users of lightweight steel framing (LSF). Begin by marking out the location of the wall on the floor. INSTALLATION GUIDE STEEL STUD DRYWALL FRAMING SYSTEMS. By creating an account you agree to the Hunker. Attach the upper track to the ceiling joists using 1 1/4-inch self-tapping drywall screws. As seen in profile, the long sides of the track and the stud are known as the web. Metal products … Framing techniques for metal studs are similar to those of wood construction. Hammer drill and carbide-tipped masonry bit, Variable-speed drill with 2-inch extension bit holder, #8 x 1/2-inch modified truss-head self-drilling screws with Phillips head, 1 1/2-inch self-tapping fine-thread drywall screws. Begin mounting the studs by inserting the first one into the bottom and top tracks. The short sides are called the flanges. As you install the studs, make sure that each is perfectly plumb and that they are aligned so the knock-out openings line up. Strength in the Face of Disaster (pdf) Download. When specifying ... Guide, NºGYP547 for details. Metal studs will not deflect around openings, which results in energy cost savings by preventing air infiltration. The metal framing components you will be using are the steel tracks, also called channels or runners, which come in ten-foot lengths; and the studs, which are available in several lengths. Deflection connectors can be used in areas where seismic activity is a factor. When steel studs are employed in external wall construction, the effect of "thermal bridging"—cold or heat being readily conducted through the wall at the studs—renders any insulation placed in the wall cavity ineffective. Steel studs make a sturdy, fireproof, termite-proof wall. All are available to suit stud centres of 300, 400, 450 & 600mm. Metal studs come standard with pre-drilled holes for plumbing and electrical applications, saving sub-contractors time and energy. Tape and finish the drywall using the same techniques as with wood frame construction. The use of steel studs in residential construction has its advocates, with good reason, but an objective assessment of the advantages and disadvantages of steel versus traditional wood studs depends on whom you talk to. Make sure the stud is aligned with the marks you made. Carefully measure the height for each stud before cutting. Metal studs are available in many of the same basic dimensions as wood studs. They also contend that steel studs are uniformly straight and even, easier to cut and easier to assemble into a wall. Drive the screws about 8 to 10 inches apart along one stud before moving on to the next. National Gypsum Company Construction Guide 311 Steel Stud p artitions Steel stud gypsum board partitions are comprised of steel floor and ceiling tracks, steel studs and Gold Bond® brand Gypsum Board, which is attached with drywall screws. Cutting metal studs with power tools requires hearing protection. Construction Guide Structural Metal Stud Framing, Technique For Structural Steel Framing In Construction, Benefits Structural Metal Stud For Construction. LSF products are cold formed structural members used as studs, joists, rafters, purlins and girts and in assemblies such as steel roof trusses and panelized walls. Is steel stud framing the construction method of the future? With over 35 years experience in the area of home improvement. Clamp the stud to the track with C-clamp pliers and secure the bottom of the stud to the track with #8 self-drilling screws. And you’ll really like the fact that steel studs are about 30 percent cheaper than wood. Mark the end positions on the joists to guide placement of the track. wajidi May 17, 2020 Uncategorized No Comments. Cut the upper track to length—usually, it will match the length of the upper track. Probably. Metal studs result in low amounts of waste at the job site since studs are delivered pre-cut. Metal studs are generally considered suitable for framing non-load-bearing walls and in particular for finishing basement spaces where the potential for excess moisture presents the problem of rot and mold growth with wood construction.